Contact
Employees and
Contact form here.
Tel: +47 511 23 287
post@dovresertifisering.no
Postal address
Lagerveien 18
4033 Stavanger
Norway
Find us
Lagerveien 18
4033 Stavanger
Se kart
Her finner du oss
Made by:
MOFix Design ©
Images used under License
from Shutterstock.com
Guidelines related to the Pressure Equipment Directive 2014/68/EU (PED)
/by Dovresertifisering[ PDF dok ]
Transition to ISO 45001:2018
/by DovresertifiseringOrganizations using OHSAS 18001:2007 are recommended to take the following actions for the migration to ISO 45001:2018 from OHSAS 18001:2007: i) Obtain a copy of ISO 45001 (or a copy of the earlier Final Draft International Standard if early planning and adaptation is preferred). ii) Identify the gaps in the OHSMS which need to be […]
Information regarding the requirements of the Pressure Equipment Directive 2014/68/EU
/by DovresertifiseringInformation that could be required to perform a conformity assessment of pressure equipment [ show document ]
European Workshop on Unfired Pressure vessels
/by DovresertifiseringFor information, the CEN Pressure Equipment Advisory Nucleus will organize an European Workshop on Unfired Pressure Vessels and the Pressure Equipment system for the future in Brussels on 30th November 2017. [program]
Transition to ISO 9001:2015 and/or ISO 14001:2015
/by DovresertifiseringRecomendations for organizations certified according to ISO 9001:2015 og/eller ISO 14001:2015 Identify organizational gaps which need to be addressed to meet new requirements. Develop an implementation plan. Provide appropriate training and awareness for all parties that have an impact on the effectiveness of the organisation. Update the existing quality management system (QMS) to meet […]
Information regarding the requirement for writing an FEA report
/by DovresertifiseringThe focus of this note is on what is required when you are using an FEA to assist in the justification of the design. [ show document ]
Information regarding Pressure gauge calibration 2014/68/EU.
/by DovresertifiseringPressure equipment needs to be tested during (final) inspection. To perform a correct pres-sure test the gauges used to indicate the pressure need to be calibrated. [ show document ]